Search This Blog

Showing posts with label Taranaki. Show all posts
Showing posts with label Taranaki. Show all posts

27 November 2023

1996 National Roading Programme: Manawatu/Taranaki NRP news

The 1996 National Roading Programme Wanganui regional office newsletter covers funding for the Manawatu and Taranaki regions. Key statistics were:

  • $53.3m for the Manawatu region and $18.6m for the Taranaki region.
  • Largest output class for the Manawatu was local road maintenance and construction at 40.5% of spending
  • Largest output class for the Taranaki region was state highway maintenance and construction at 41.1% of spending
Major committed projects included:
  • SH4 Laurence's Dropout
  • SH3 Maxwell to Bushy Park upgrade
  • SH57 Laws Hill realignment
  • FItzherbert Avenue 4-laning in Palmerston North City
New construction projects funded included:
  • 7.6km seal extension on SH43 Moki Tunnel
  • SH3 realignment Mimi Curves
  • SH1 Vinegar Hill realignment ($5.1m)
  • SH43 Tahora Flats seal extension of 2.3km
  • SH1 realignment south of Waiouru railway crossing
  • SH2 Bradleys realignment south of Dannevirke
  • SH3 Grants Hill corner realignment
  • SH4 Waihapa curves easing




22 July 2023

National Land Transport Programme 1996 - Whanganui regional office newsletter (Taranaki, Manawatu-Whanganui)

 

Translink August 1995

NLTP 1996 Taranaki/Manawatu-Whanganui new projects

NLTP 1996 Taranaki/Manawatu-Whanganui new projects

NLTP 1996 Taranaki/Manawatu-Whanganui summary

Translink was the newsletter for the Wanganui regional office of Transit New Zealand, covering Manawatu-Whanganui and Taranaki regions. This edition on the NLTP 1996 noted the following spending in the regions:
  • $40.5m total in Manawatu/Wanganui
  • $18.2m total in Taranaki
  • $30.7m  to be spend on local roads maintenance and capital (the majority of spending in the region)
  • $262,000 for passenger transport funding
Major new projects (over $1m) include:
  • Maxwell to Bushy Park Road Stage III realignment SH3 Whanganui;
  • Laws Hill Realignment SH57 south of Shannon;
  • Pipiriki Rd seal extension in Ruapehu District.
Other key projects noted were:
  • Seal extension SH43 of 2.2km (representing the start of sealing this State Highway, which was still not fully completed in 2023!)
  • Continuing the Potts Hill realignment SH57 north of Levin
  • Completing Greatford realignment SH1 north of Bulls
  • Completing 4-laning of Manawatu River Bridge and Fitzherbert Avenue Palmerston North
Notable is the relatively high spending on local roads in the region. State highway spending predominantly is focused on realignments, but the 4-laning of Manawatu River Bridge and Fitzherbert Avenue was about relieving congestion in Palmerston North between Massey University and the rest of the city.  

31 May 2023

In Transit March 1995 - No 61 - focus on bypasses

 

In Transit March 1995 No 61

Bypasses

Urlich Hill, Tar Hill, Catlins

Auckland south-eastern arterial etc

Bypasses

This edition ran a feature article on bypasses, highlighting the construction of the Pokeno bypass on SH1 being tendered (which would become essentially the top stage of the Waikato Expressway). The key point being how bypassing the town enabled reconstruction of its main road to suit local traffic and visitors, whereas some towns feared bypasses would mean the end of passing trade, Pokeno was welcoming it. 

The article continues to make some points about different towns and the conditions that determine whether or not a bypass might proceed such as whether existing roads are largely used vs. a new corridor (as the latter is more expensive it is less likely to be funded).  Levin and Stratford were cited as towns where it was too expensive to build a bypass as a new road would be needed.  Levin curiously was noted that 75% of southbound traffic and 66% of northbound traffic stops in Levin - given the current project to extend the Otaki Expressway to north of Levin (bypassing it), conditions have clearly changed somewhat.   Hikurangi and Mangonui in Northland have both benefited from bypasses, and it was noted that relocating SH1 away from downtown Hamilton had enabled the main street to be made more pedestrian friendly.  This reportedly increased city centre shopping.  

Wanganui was noted as having a motorway designation for a bypass, but this was considered unrealistic given traffic volumes, so a bypass close to the proposed route is proposed.  Ashburton was an interesting case study, in that SH1 was relocated onto a parallel road away from the town centre, but development occurred on the new route. This is considered suboptimal, because it simply means the new route becomes congested as well.  Transit NZ focused on bypasses providing safer and more efficient traffic flow.

Size of towns was important in considering bypasses, with Hamilton, Tauranga and Palmerston North having the main arterial running through them, able to stand on their own, but smaller towns regard through traffic as a lifeblood.  Timaru was noted as upgrading its main shopping street once its bypass is completed. Temuka likewise.  In Dunedin, SH88 was relocated away from Anzac Square/Dunedin Railway Station to make it more attractive for tourists, which was paid for fully by Dunedin City Council because it was a marginal disadvantage to motorists on the state highway. Progress was noted on designing bypasses for Motueka and Stoke, despite funding being considered marginal at this time. Finally, the bypass of Orewa (which ultimately became the Northern Gateway toll road) was noted as being as issue, because residents were concerned about the effect of the link road into Orewa (plus the original bypass designation was shelved, because Orewa's development mean the bypass would run between developments.

Other projects

  • Urlich Hill realignment in Northland was approved (a 1km project)
  • Mangaiti Hill deviation south of Tokoroa on SH1 had started (a 6 km project)
  • Funding for sealing 11km of the Catlins Road had been approved, with a remaining 32km left to be sealed.
  • Transit NZ has approved funding for Auckland City Council's South-Eastern Arterial project (with plans for it to be linked to Mangere Bridge in due course)
  • Strategy underway to ease congestion on Auckland's Northern corridor, by relieving bottlenecks on approaches to the Harbour Bridge, and developing a priority lane between Onewa Rd and Constellation Drive to encourage bus use and high occupancy vehicles. This would ultimately lead to construction of the Victoria Park Tunnel and the Northern Busway (although at the time the plan was for widening the Victoria Park viaduct). Note the expectation at the time was that the busway would be a high-occupancy vehicle lane.